Boiler Failure Required All Seasons Hire Assistance

Following an urgent call from our client requiring help when a boiler failure caused total loss of all heating and hot water All Seasons Hire immediately jumped to their assistance.

An engineer was sent straight to site to survey the situation and it was determined a 600kw Boiler package was required. The relevant parts to the package were picked, 600kW boiler, 3,000 litre fuel tank, 250kW dhw plate heat exchanger, Storz hoses and fittings, then loaded ready to supply.

The Boiler package was delivered and installed with the flow and return connected straight onto the client’s existing circuit enabling the minimum amount of disruption to the client and all personnel.

ASH also provided a fuel management service which gave the client complete peace of mind, knowing the boiler could be run continuously without running out of fuel, in short, a total turnkey operation.

All Seasons Hire should always be your first port of call, for fast, efficient and effective advise and assistance. Please contact us to see how we can help you.


Back to articles

About the Author

Chris Henderson

Chris has 7 years of experience working at heating & cooling specialists All Seasons Hire. Working in all areas of the business means there’s not much he hasn’t picked up. You will find him writing about ASH news, their latest projects and plenty of tips and advice.


You may also like

Leave a Reply

Please note. Your email address will not be published. Required fields are marked *