⏱ Read time: 8 min | 🛠 Difficulty: Intermediate | ⏰ Time: Half a day (4 hrs) | 👷 2 man
Direct answer - To choose the right access tower for winter jobs, match the working height to the task, then pick a stable mobile access tower you can build on firm, level ground. Check the forecast for wind and frost, plan around short daylight, and hire access towers from HSS DIY.
Key takeaways
- Work out your working height first. It is roughly the platform height plus 2m.
- Winter weather hazards matter as much as height: wind, frost, wet ground and early darkness.
- Hiring a scaffold tower starts from £99.00* for an average hire, which beats buying for a one-off job.
- Check the forecast, the ground and the tower before every climb, not just the first one.
- Still wondering which access tower you need? Our Live Chat team can help you pick.
*Prices are correct as of November 2026 and are subject to change. Please check the live product pages for current pricing.
In this guide
- What working height do I need for winter jobs?
- What types of access towers are there?
- Which weather hazards should I plan for in winter?
- Which scaffold tower do I need for wet, frosty or windy days?
- How much does it cost to hire a scaffold tower?
- How long will a winter tower job take?
- How do I stay safe whilst using access equipment in winter?
- Winter access tower checklist
- Frequently asked questions
- Conclusion: pick the tower, then pick your day

How do I work out the working height I need?
Add about 2m to the platform height to find your working height, then check it against the highest spot you need to reach. A 4m platform gives roughly a 6m working height, which suits many two-storey eaves.
Working height is how high you can safely reach from the platform, not the height of the platform itself, which is why we add that 2m. Measure to the spot you will actually work on, not the roof ridge, and never stretch from the top. If you find you’re overreaching, move the tower.
Winter adds one rule: choose the lowest platform that gets you there. We explain why later.
- Measure from the ground to the highest point you need to reach.
- Subtract about 2m to get the platform height you need.
- Round up to the next platform size available.
- Check the width and firmness of the ground where the tower will stand.
What types of access towers are there?
The main types of access towers are one-person quick-build towers, wider two-person towers, staircase towers and low-level podiums. A mobile access tower sits on lockable castors, so you can reposition it between jobs without taking it apart.
The table below compares the towers we hire at HSS DIY by working height and shows why each one suits winter work.

Not sure a tower is the right kit? Ladders only suit short, light jobs, so if yours runs longer or needs tools at height, a tower is worth a look. Our guides on scaffold towers versus ladders and podium towers versus scaffold towers compare the different access options.
Then choose which tower you’ll need by who and what is going up. Working solo with a few tools? The MiTower 4m Platform is built for one person. Two people, or a platform loaded with paint, tools and a bucket? The MiTower Plus takes up to two people and has a 275kg safe working load.
Which weather hazards should I plan for in winter?
Wind, ice and soft ground are the big three winter weather hazards, with early darkness and storms close behind. Working outdoors in adverse weather conditions needs a clear go or no-go rule, so decide yours the night before.
- Wind. Wind speed rises with height, so it can feel calm at ground level and gust hard at the platform. PASMA points to 17mph (Beaufort 4) as a speed to watch, and your manufacturer's manual sets the real limit. Tower choice: the lowest tower that reaches the job, ideally with a wind-lock catch.
- Frost and ice. Frozen platforms, guardrails and castors are slippery, so wait for it to clear. Tower choice: staircase access over a ladder on higher jobs.
- Rain and wet ground. Wet ground softens and wet boots slip. Tower choice: a wide base with stabilisers fully set, on firm, level ground only.
- Thaw. Ground that was rock solid at 8am can turn soft by lunchtime. Tower choice: book a day or two spare, and re-check the tower is level before each climb.
- Short daylight. It is dark by mid-afternoon in December. Tower choice: a quick-build tower, so more of the day goes on the job and less on the build.
- Storms and lightning. Climb down and stay off the tower. Tower choice: none. Postpone, and keep an eye on the Met Office warnings.
For a fuller rundown, read our guide to working at height in adverse weather.
Which scaffold tower do I need for wet, frosty or windy days?
Choose the lowest, widest scaffold tower that still reaches the job. Lower means less wind on the platform, and wider means a steadier base.
Build to the manufacturer's instructions every time, and make sure stabilisers are fully set and castors locked. The MiTower even has a wind-lock catch to stop the platform lifting in gusts, though it is no licence to work in a gale.
What our customers say
⭐⭐⭐⭐⭐ “My whole experience was excellent from my online booking to delivery and collection of a scaffolding tower…the tower was as shown in the video simple to erect with one other person, well designed and simple to use.. Delighted overall.” Tina’s review on our scaffolding tower.
⭐⭐⭐⭐⭐ “Rented a scaffold tower for a few days. Great product in good condition and in its own wheeled "basket" that made it easy to move around and assemble. Reasonable price with delivery and collection included.” kbparson’s review on our scaffold tower.
How much does it cost to hire a scaffold tower?
Scaffold tower hire starts from £99.00* for an average six-day hire of the MiTower 4m Platform.
Wondering how much to hire a scaffold tower against buying one? The table compares hiring with buying from HSS DIY.
*Prices depends on the tower and how long you keep it, so check the product page for your dates.
*Prices are correct as of November 2026 and are subject to change. Please check the live product pages for current pricing.

How long will a winter tower job take?
Allow half a day (4 hrs) for a small job like clearing gutters, from build to pack-away. Bigger jobs take longer, so book a spare day in case the weather turns.
- The day before (30 mins). Check the forecast for wind, frost and rain, clear a safe area and lay out your kit. If the forecast looks rough, rebook.
- Delivery. Unpack and check every part against the manual. If your order has several items, they could arrive separately, so make sure everything has landed.
- Before you build (10 mins). Wait for any frost to clear, then check the ground is firm and level.
- Build (10 to 20 mins). The MiTower 4m Platform takes around 10 minutes, and the MiTower Plus under 20.
- The job (2 to 3 hrs). Work through the middle of the day, when it is lightest, and re-check the tower is level if the ground thaws.
- Dismantle and pack away (10 mins). Dry the parts, then return them.
How do I stay safe whilst using access equipment in winter?
Staying safe whilst using access equipment comes down to planning, grip and light. The HSE guidance on work at height is clear that you should avoid working at height where you can, and use the right equipment where you cannot.
- Training. Always follow the manual provided with the tower. For bigger builds, consider PASMA training with HSS Training.
- Footwear and gloves. Wear grippy soles and warm gloves with real grip.
- Lighting. Shorter days means less good light, so hire some lighting options.
- A second person. Having someone at the base means they can spot changes in the conditions while you're focused on the job.
- Overhead hazards. Look for power lines and low branches before you build, and keep people and pets away from the base.
- Safe climbing. Climb inside the tower using the built-in ladder, never up the outside.
You can see the build in action in the product video or on the HSS DIY YouTube channel. For more, see PASMA's safety FAQs.

Winter access tower checklist
Before you order
☐ Measured the working height and added headroom
☐ Checked the width of the space and the ground
☐ Picked hire dates with a sensible forecast
☐ Added gloves, lighting and a second person
Before you build
☐ Ground firm, level and free of ice
☐ Parts checked against the manual
☐ Stabilisers set and castors locked
Before every climb
☐ Wind within the manual's limit
☐ Platform, guardrails and rungs dry and ice free
☐ Boots clean and gloves on
☐ Tools in a bag, not your pockets
Frequently asked questions about access towers
Which access tower do I need for a two-storey house in winter?
Most two-storey eaves need a working height of around 5m to 6m, so a 4m platform such as the MiTower 4m Platform is a good starting point.
Can I use a scaffold tower in the rain?
Light rain on firm ground is workable if everything stays grippy, but wet surfaces raise the risk. Stop if the ground softens, the platform gets slippery or the weather turns.
What wind speed is too windy for an access tower?
PASMA flags 17mph (Beaufort 4) as a speed to watch. Always follow the limit in your tower's manual, because it varies between models.
Do I need training to use a mobile access tower?
Not for every job, but follow the manual closely. PASMA training is worthwhile for larger towers.
Can I hire an access tower and get it next day?
Yes, next day delivery is available when you hire from HSS DIY, subject to stock and your postcode. Items in one order can arrive separately.
Can I build a tower on frozen or sloping ground?
No. A tower needs firm, level ground. Frozen ground can soften as it thaws, so wait for it to settle or choose a different spot.
Pick the right access tower for your winter jobs with HSS DIY
And that’s all there is to it!
Choosing the right access tower for winter jobs is half hardware, half patience. You need to measure the working height, pick the lowest and widest tower that does the job, check the ground, and be willing to wait for a dry, calm, frost-free day.
Don’t forget to wear your safety boots, helmet and gloves too!
Ready to hire from HSS DIY? Browse our access tower hire range to find the right tower for your winter jobs. We offer same day or next day delivery, depending on the time you make your order, or you can opt to collect it from one of our partner branches. Just make sure you check what size vehicle is needed for collection.
Buy the materials. Hire the tools. One order. All in one place.
Get DIY Happy with HSS DIY: The Home of Great Projects.
Meet the people behind our Tips & Advice
From quick fixes to bigger DIY projects, get to know the people behind the guides helping you get the job done with confidence.